SÜ Campus Infrastructure
Infrastructure, environmental design and road construction within the Selçuk University Campus
Employer: Selçuk UniversityContract Date: 23.09.2009
Finish Date: 16.01.2011
Infrastructure, environmental design and road construction within the Selçuk University Campus
Employer: Selçuk UniversitySuperstructure, engineering structures on Konya - Akşehir State Road between km: 102+000-124+000; missing soil works between km: 102+000-112+200; grading and leveling works and road construction between km: 112+200-124+000
Employer: Regional Directorate of HighwaysGrading, leveling, engineering structures, superstructures and road construction on Akşehir-Afyonkarahisar State Road between km: 131+000-146+200
Employer: Regional Directorate of HighwaysBridge building, bored pile, precast prestressed beam, concrete shear wall, road, storm drainage, deplacement of sewerage line, deplacement of communication line, installation of natural gas line, deplacement of light rail system over two light rail bridges
Employer: Konya Metropolitan MunicipalityWidening of the existing Konya-Ankara Road between Aksaray Road Interchange and 2. Organize Interchange
Employer: Konya Metropolitan Municipality