Completed Projects

  • 2. Organize Interchange

    Intechange construction on Konya-Ankara Road Organized Industial Zone intersection

    Employer:Regional Directorate of Highwayscomp
    Contract Date:11.10.2005
    Finish Date:22.11.2006
  • Akşehir-Afyon Road

    Grading, leveling, engineering structures, superstructures and road construction on Akşehir-Afyonkarahisar State Road between km: 131+000-146+200

    Employer:Regional Directorate of Highways
    Contract Date:23.12.2008
    Finish Date:01.12.2011
  • Aselsan Konya Infrastructure

    Aselsan Konya Excavation, Filling, Infrastructure And Landscaping Works

    Employer:Aselsan Konya Weapon Systems Inc.
    Contract Date:17.12.2019
    Finish Date:20.05.2021
  • Aslım Solid Waste Storage

    Excavation works, drainage works, barracks including personnel and watchmen cabins; compression and covering of 482.625 m3 of waste

    Employer:Konya Metropolitan Municipality
    Contract Date:19.04.2006
    Finish Date:05.05.2008
  • Borsa Interchange

    Interchange construction on Konya-Adana Ringroad at Borsa (Konya Commodity Exchange)

    Employer:Konya Metropolitan Municipality
    Contract Date:05.10.2012
    Finish Date:03.06.2013
  • Bosna Hersek Interchange

    Bridge building, bored pile, precast prestressed beam, concrete shear wall, road, storm drainage, deplacement of sewerage line, deplacement of communication line, installation of natural gas line, deplacement of light rail system over two light rail bridges

    Employer:Konya Metropolitan Municipality
    Contract Date:22.10.2008
    Finish Date:03.07.2009
  • Çeçenistan Interchange

    Interchange construction on Çeçenistan Street

    Employer:Konya Metropolitan Municipality
    Contract Date:29.08.2013
    Finish Date:16.09.2015
  • Dedekorkut Water Reservoir

    Dedekorkut 15.000 m3 water reservoir

    Employer:Koski (Konya Water Works)
    Contract Date:04.07.2006
    Finish Date:23.11.2007
  • Dudu Kadın Bazaar

    Construction of Dudu Kadın Bazaar

    Employer:Akşehir Municipality
    Contract Date:21.12.2016
    Finish Date:16.10.2019
  • Karaman Natural Gas Infrastructure

    Karaman city natural gas infrastructure expansion project for the year 2013

    Employer:Energaz Gaz Su Elektrik Dağıtım A.Ş.
    Contract Date:01.06.2013
    Finish Date:31.12.2013
  • Karaman Road Interchange

    Konya Ringroad - Karaman Road intersection

    Employer:Konya Metropolitan Municipality
    Contract Date:07.08.2007
    Finish Date:16.04.2008
  • Konya 5th Organized Industrial Zone Infrastructure

    Konya Organized Industrial Zone 5th Part Expansion Area Wastewater Network, Storm Water Network And Road Infrastructure Works

    Employer:Directorate Of Konya Industrial Park
    Contract Date:6.12.2017
    Finish Date:30.12.2020
  • Konya Fish Market

    Concrete carrier system, steel roof, shops and offices, chill stores, hydraulic elevators, environmental design, eletrical installations on a building area of 5000 m2

    Employer:Konya Metropolitan Municipality
    Contract Date:21.05.2007
    Finish Date:09.05.2008
  • Konya Natural Gas Infrastructure

    Konya city natural gas distribution system project involving installation of service lines, polyethylen lines, steel lines, specific line crossings (road, railway, stream), high-pressure BOTAŞ (intercity) line, valves, RMS-B stations, concrete base plates; excavation, filling, asphalt, and road construction works

    Employer:Gaznet Şehir Doğal Gaz Dağıtım A.Ş.
    Conctract Date:28.05.2004
    Finish Date:29.12.2008
  • Konya Natural Gas Infrastructure 2013

    Konya city natural gas infrastructure expansion project for the year 2013

    Employer:Energaz Gaz Su Elektrik Dağıtım A.Ş.
    Contract Date:10.06.2013
    Finish Date:31.12.2013
  • Konya Ringroad Renovation

    Grading, leveling, drainage works; engineering structures; subbase, plant-mix base and hot-mix asphalt pavement on various streets within the municipal adjacent area of Konya Metropolitan Municipality

    Employer:Konya Metropolitan Municipality
    Contract Date:12.08.2011
    Finish Date01.03.2013
  • Konya Velodrome

    Konya Veledrom Construction Work

    Employer:Ministry Of Youth And Sports
    Contract Date:14.01.2021
    Finish Date:1.07.2022
  • Konya-Akören Road

    Grading, leveling, superstructure, engineering structures, and road construction on Konya - Seydişehir fork Akören - Bozkır road between km: 5+900 - 26+710

    Employer:Regional Directorate of Highways
    Contract Date:18.08.2005
    Finish DAte:01.12.2011
  • Konya-Aksaray Road 13-72

    Grading, leveling, superstructure, road works; engineering structures on Konya-Aksaray State Road between km: 13+000-72+000

    Employer:Regional Directorate of Highways
    Contract Date:08.08.2011
    Finish Date:16.11.2013
  • Konya-Akşehir Road

    Superstructure, engineering structures on Konya - Akşehir State Road between km: 102+000-124+000; missing soil works between km: 102+000-112+200; grading and leveling works and road construction between km: 112+200-124+000

    Employer:Regional Directorate of Highways
    Contract Date:01.04.2009
    Finish Date:12.12.2011